Skip to main content
Image
Why DockFrame cost what it costs

Why DockFrame costs what it costs

Around 1,800 people subscribed to the DockFrame campaign and 67 have backed it so far. When we ask why, the answer we hear most is the price. So in this post I want to show you where the money goes.

I will use the Full Kit as the example, because it is the one most backers choose. It costs $399 and includes the hub and our four cards.

Where the $399 goes

The tariff surprises most people. It is 50% of the manufacturing cost. Our boards are assembled in China and Crowd Supply ships from Texas, so everything is imported into the US first. We pay that tariff on every kit, including the ones that later go to Europe or Asia.

Image
Money Pie CHart

 

What the last 15% has to pay for

That 15% is about $60 per kit, and it is not profit yet. It has to cover everything we spend only once, no matter how many kits we sell.

The biggest one is certification. To sell in Europe and the UK every product needs EMC testing and CE and UKCA declarations. Three of our cards also have radios, and those need a second, more expensive set of radio tests. The Multimeter and Power Supply cards have the ESP32 chip directly on the board, not a pre-certified module, so the full radio testing is on us. We budgeted about $12,000 for all of it. Our first production run is 200 products. If you divide $12,000 by 200 you get $60 per product. So the certification alone uses all of it.

After that come the prototypes. We built several rounds of boards for the hub and for each card, plus the enclosure prototypes, and each round means paying for boards, parts, assembly and shipping again. So far that is about $10,000.

Image
Hub PCB

 

Then there is the work nobody sees in the photos. We wrote the firmware for the Multimeter and Power Supply cards and the two browser apps that control them. Every unit has to be tested before it ships, and we have to build the fixtures to do that. We also write the documentation and the safety instructions in two languages, and we committed to five years of security updates.

And at the end, taxes on whatever remains.

So the price is not hiding a big margin.

When a cost does come down, we pass it on. A few months ago we redesigned the hub to make it cheaper to build. When the new factory price arrived, we lowered the price of the Framework User Kit and our funding goal.

Why small runs cost more

A hub from a big brand is made 100,000 at a time. We are making 200. That changes almost every slice of the chart above.

Certification costs the same for 200 units or 200,000. For us it is $60 per product. For a big brand it is a few cents.

Image
certification per product

 

Parts are cheaper when you buy more. The same chip can cost half as much when you order by the reel.

The factory charges a setup fee for every board design, for things like the stencil and programming the machines. We have five designs and we pay it five times, spread over very few boards.

For the enclosure, an injection mold costs thousands of dollars before the first case comes out. With enough orders it is the cheapest way to make a case. With 200 it is not, and we will choose how to make the final enclosure when we know how many orders we have.

Freight works the same way. A small shipment costs much more per box than a full container.

If we sold ten times more, the price could come down a lot. To be honest, we can't promise a lower price later, because it depends on how many people join.

What we will do with the money

First, build and ship what you ordered: the hub, the Multimeter, the Power Supply, the BreadBoard Card and the Mini Hub Card.

Then we want to keep improving it:

β–  Power Delivery support on the Mini Hub Card. 
β–  More Tool Cards. The one you ask for most is an oscilloscope.
β–  A better enclosure, with aluminum alloy materials for better passive cooling if the volume allows it.

When the campaign ends we publish everything: schematics, PCB files, firmware, the browser apps and the FreeCAD files for the case. We did the same with our previous product, WebScreen. If you think you can build it cheaper, you will have all the files to try, and we would love to see it.

If the price is what stops you

Tell us. We read everything, and your feedback already changed the product. The hub-only option exists because people on the Framework forum asked for it.

You can ask me anything on Discord or with the Ask a question link on the campaign page.

And if you want DockFrame to exist, the best help is to back it on Crowd Supply or share it with someone who would use it.

Image
Crowd Supply Logo